Substation

Substation Projects

tme-008TME’s experience in substations ranges from power substations to distribution substations. These substations range from 110 kV up to 400 kV voltage level using various types of equipment.

TME started developing the engineering and procurement of substation projects in close coordination with worldwide known switchgear manufacturers.

TME’s professional working system has been adopted for all power and substation projects obtaining the confidence of the clients for its capabilities.

TME’s Involvement in Substation Projects

Executed Substation Projects:

  • Four Substations in Jeddah – 110 kV GIS, 3 x 40 MVA, KSA.
  • Madinah Haram II Substation – 110 kV GIS, 3 x 40 MVA, KSA.
  • Abha North Substation – 132 AIS, 3 x 40 MVA, KSA.
  • Aqaba Substation – 400/132 kV GIS, 2 x 40 MVA, Jordan.
  • Hail Substation – 380/132 kV AIS/GIS, 2 x 400 MVA, KSA
  • Extension of Existing Substations at Riyadh Power Plant, PP7 Extension I & II, KSA
  • Extension of Existing Substations at Riyadh Power Plant, PP8 Extension I & II, KSA
  • Extension of Existing Substations at Asir & Jizan CPS Extension I, KSA
  • Extension of Existing Substation at Najran CPS Extension I & II, KSA
  • Extension of Existing Substation at Madinah CPS Extension II, KSA
  • tme-011Extension of Existing Substation at Duba Power Plant Extension, KSA
  • Extension of Existing Substations at Asir, Jizan, & Tihama CPS Extension II, KSA
  • Taif 380 / 110 kV GIS Substation, 2 x 500 MVA, KSA
  • Extension of Existing Substations at Asir, Jizan, & Tihama CPS Extension III, KSA
  • Sawamleh & Al-Leith 110/33/13.8 kV AIS Substation, 2 x 50 MVA + 2 x 31.5 MVA, KSA
  • Al Safa 110/13.8 kV GIS Substation, 3 x 40 MVA, KSA
  • Khayber Substation 110/33/13.8 kV AIS Substation, 2 x 31.5 MVA + 2 x 40 MVA, KSA
  • Al Aous Substation 110/13.8 kV GIS Substation, 3 x 40 MVA, KSA
  • Saudia City Substation 110/13.8 kV GIS Substation, 3 x 40 MVA, KSA
  • Al Haram III 110/13.8 kV GIS Substation, 3 x 40 MVA, KSA